Full Product Line, Tight Timeline

A medical device company encountered the challenge of bringing an entire metal implant line of over a hundred parts to market within nine months. This process included everything from design, manufacturing, packaging, and sterilization. Donatelle came alongside this company by offering them a project manager exclusively for the project, and assembled a multi-disciplinary engineering team that acted as an extension of the customer’s company. Due to Donatelle’s experience, the process validation was effectively applied to ensure consistency throughout the product lifecycle, and the entire product line was completed and ready to go on time. Download the case study for the full story.
Get unlimited access to:
Enter your credentials below to log in. Not yet a member of Med Device Online? Subscribe today.